Ways out21 min readUpdated October 2026

Timeshare Cancellation Deadlines in All 50 States

Every state's timeshare cancellation deadline we could check against the statute, when the clock starts, how the notice has to be sent, and whether the postmark or the delivery date counts. Thirty-nine states have a rule we verified; eleven do not, and we explain each one.

An open paper planner on a desk

Your state’s deadline, in one table

Thirty-nine states give timeshare buyers a statutory right to cancel that we could check against the statute, with deadlines that range from 72 hours (Indiana) to 15 days (Alaska, and Tennessee when the buyer skipped an on-site inspection). In many of those states the countdown starts only when you receive the required disclosure documents, so the deadline may be later than the date you signed. Signed within the past two weeks? Look up your state and get the written notice out today: cancelling inside this window is the one exit that refunds what you paid.

The other eleven states have no timeshare cancellation statute we could confirm. Their rows are blank on purpose, with a note on what we found. A guessed deadline that turns out wrong can cost a buyer the full refund, and several statutes that other fifty-state lists still quote have been repealed or govern a different kind of property.

A second table covers how each state lets you send the notice, whether a postmark is enough, and how fast the refund has to come back. We only filled it in where the statute itself says so.

The 39 states with a cancellation statute

Give the last column as much attention as the deadline. “Days” means calendar days unless the row says business days. Massachusetts, Rhode Island and Utah define business days to leave out Saturdays, Sundays and holidays; Delaware’s definition leaves out only Sundays and legal holidays, so a Saturday counts there.

StateStatuteTime to cancelCountdown begins
AlabamaAla. Code 34-27-535 days; a Sunday falling on day five is not countedWhen you sign
AlaskaAS 34.08.58015 daysWhen you receive the public offering statement, if it was not provided at least 15 days before you signed
ArizonaA.R.S. 32-2197.0310 calendar daysWhen you execute the purchase agreement
ArkansasArk. Code 18-14-4095 days; the contract also stays voidable until you get the public offering statementWhen the contract is executed
CaliforniaBus. & Prof. Code 112387 calendar days, or longer if the contract says soLater of signing and getting the public report
ColoradoC.R.S. 6-1-7035 calendar daysThe sale
ConnecticutConn. Gen. Stat. 42-103pp5 calendar daysSigning and getting a copy of the contract, or receiving the disclosure statement, whichever is later
Delaware6 Del. C. 28245 business days; Saturdays count, Sundays and legal holidays do notWhen the contract is executed
FloridaFla. Stat. 721.1010 calendar daysSigning, or receiving the last required document, whichever is later
GeorgiaGa. Code 44-3-1747 days, Sundays and holidays left outLater of signing and getting the offering statement
HawaiiHRS 514E-87 calendar daysLater of signing and getting the disclosure statement
IdahoIdaho Code 55-1804A5 calendar days, until 11:59 p.m. of day five; the chapter’s definition of subdivided lands includes time shared propertyWhen the contract is executed
Illinois765 ILCS 101/10-105 calendar daysWhichever comes last: signing, or getting the offering statement
IndianaInd. Code 32-32-3-772 hours, Sundays and legal holidays left outWhen the sales contract is executed
IowaIowa Code 557A.145 business daysReceipt of all the information the statute requires
LouisianaLa. R.S. 9:1131.137 calendar days, and either side may cancelLater of signing and getting the offering statement
Maine33 M.R.S. 59210 calendar daysSigning or receipt of the current written statement, whichever is later
MarylandMd. Real Prop. 11A-11410 calendar daysThe latest of the contract date, receipt of the last required document, or the unit being ready to occupy
MassachusettsMass. Gen. Laws ch. 183B s. 413 business days; no right under this section if you got the offering statement more than 3 business days before signingGetting the offering statement
MinnesotaMinn. Stat. 83.285 daysActually getting a readable copy of the contract, plus the offering statement
MissouriMo. Rev. Stat. 407.6205 daysThe purchase date
NebraskaNeb. Rev. Stat. 76-17163 business daysGetting the offering statement
NevadaNRS 119A.4105 calendar days, ending at midnightWhen the contract is executed
New JerseyN.J. Stat. 45:15-16.677 calendar daysLater of signing and getting the offering statement
New MexicoN.M. Stat. 47-11-57 daysWhen the contract of sale is executed
North CarolinaN.C.G.S. 93A-455 daysLater of signing and getting the offering statement plus every required document
Oklahoma71 O.S. 6435 days; part of the state’s subdivided land sales code, so it reaches sales that had to be registered under that codeGetting the signed contract along with the offering statement
OregonORS 94.8365 calendar daysYour signature on the first written offer or contract (and not until the developer supplies its cancellation address)
Pennsylvania63 P.S. 455.6095 daysWhen the purchase contract is executed
Rhode IslandR.I. Gen. L. 34-41-4.065 business days, weekends and holidays left outLater of signing and getting the final required document
South CarolinaS.C. Code 27-32-405 days; a Sunday falling on day five is not countedLater of signing and getting the disclosure statement
TennesseeTenn. Code 66-32-11410 days if you inspected the resort before signing, otherwise 15; the contract also stays voidable until you get the offering statementWhen you sign
TexasTex. Prop. Code 221.041Until before the sixth daySigning and getting a copy of the contract, or receiving the disclosure statement, whichever is later
UtahUtah Code 57-19-125 business days; the signing day is not countedThe day you sign the agreement
Vermont27 V.S.A. 6075 days; a mailed notice has to go by certified mail, dated no later than the fifth dayWhen the contract is executed
VirginiaVa. Code 55.1-22217 calendar days; a deadline landing on a Sunday or legal holiday moves to the next dayWhen the contract is executed
WashingtonRCW 64.36.1507 daysExecution; if the disclosure document arrives late, you get 7 days from when it arrives
West VirginiaW. Va. Code 36-9-510 daysLater of signing and getting the offering statement
WisconsinWis. Stat. 707.475 business daysLater of signing and getting the final required document

How to send the notice, and whether the postmark counts

This is the part a developer can dispute, so it gets its own table. We re-read all 39 statutes above in October 2026 and recorded only what each one actually says about sending the notice, the moment it takes effect, and the refund. “Not stated” means that statute is silent on the point, which is a reason to get the letter there early, since the developer, or a court, will look to your contract instead.

StateWays the statute lets you send itWhen a sent notice countsRefund deadline in the statute
AlabamaWritten notice by certified mail, return receipt requested, according to the contract statement the statute requiresNot statedNot stated in this section
AlaskaHand delivery, or prepaid U.S. mail to the seller or its agent for service of processNot statedPayments refunded “promptly”
ArizonaSend or deliver a written notice to the seller’s address shown in the agreementOn the date it is sentNot stated in this section
ArkansasHand delivery, or mail to the developer or its agent for service of processWhen deposited in the mailWithin “a reasonable time”
CaliforniaWritten notice to the place of business named in the contract; the required contract notice also allows fax or hand deliveryMail: presumed given on the postmark date. Fax: on confirmed transmission. Other: when deliveredNot stated in this section
ColoradoEmail or other electronic means, mail, or hand deliveryMail: when postmarked. Email: when sent. Hand delivery: when it reaches the seller’s place of businessDeposit back within 7 days of the notice, or within 7 days after your check clears if it had not cleared yet
ConnecticutHand delivery, prepaid U.S. mail, fax, or overnight carrierThe required contract notice says the date sent for mail or overnight carrier, and the moment of transmission for fax20 business days after the developer gets the notice, or 5 days after your funds clear, whichever is later
DelawareCertified mail only, to the address in the contractOn mailingWithin 15 days
FloridaMail, or another written methodMail: the postmark date, provided the developer actually receives it. Other methods: on delivery20 days after you demand it, or 5 days after your check clears, whichever is later
GeorgiaThe required contract notice says certified mail or statutory overnight delivery, return receipt requestedThe required notice says on the date you send it30 days after the notice arrives
HawaiiMail or deliver it to the address specified in the contractOn mailing or deliveryNot stated in this section
IdahoPersonal delivery, or certified mailDelivered or sent by 11:59 p.m. of day fiveNot stated in this section
IllinoisHand delivery, or certified mail with return receipt requestedTimely if handed to the Postal Service by midnight of day five20 calendar days after the notice or cleared funds, whichever is later
IndianaMail, telegram, or other written noticeMail: the postmark date. Other writing: on delivery at the developer’s or escrow agent’s place of businessNot stated in this section
IowaHand delivery or personal service, electronic notice, or prepaid U.S. mailNot stated30 days after the notice arrives
LouisianaHand delivery, or certified mail with return receipt requestedMail: the postmark date. Other writing: on delivery to the developer30 days after the notice or cleared funds, whichever is later, and never later than 60 days after the notice
MaineHand delivery, or prepaid U.S. mailNot statedDeposit returned “promptly” and in full
MarylandMail, or another written methodMail: the postmark date, provided the developer actually receives it. Other methods: on receipt at the developer’s main office20 business days after you demand it, or 5 days after your check clears, whichever is later
MassachusettsHand delivery, registered mail with return receipt, telegram, or next-day courierMail: the postmark date. Telegram or courier: when sentImmediately if your deposit check has not been deposited; otherwise within 7 days of the notice, once the funds have cleared
MinnesotaWritten notice to the address in the contract; the required notice tells buyers to mail itOnce dropped in a mailbox, correctly addressed with postage paidRequired notice promises a refund within 30 days of the seller getting your notice
MissouriWritten notice; the required contract notice covers mail to the address in the agreementMail: when postmarkedNot stated in this section
NebraskaHand delivery, or prepaid U.S. mailNot stated30 days after the notice arrives
NevadaIn person, certified mail with return receipt, or express, priority or overnight service with proof of serviceNot stated20 days after the developer gets the notice
New JerseyHand delivery, or certified mail with return receipt requestedTimely if handed to the Postal Service by midnight of day seven30 days after the notice or cleared funds, whichever is later
New MexicoHand delivery, or mail to the developer or its agent for service of processNot stated30 days after the notice arrives
North CarolinaMail, electronic means, or other writingMail: the postmark date. Electronic: when transmitted. Both only if the developer or escrow agent actually receives it. Other writing: on delivery20 days after you demand it, or 5 days after your funds clear, whichever is later
OklahomaNot statedNot statedNot stated in this section
OregonWritten notice to the developer’s address; certified mail with return receipt if you mail itOn the day it is deposited with the Postal ServicePayments returned “immediately,” once any check has cleared
PennsylvaniaCertified mail with return receipt, or any delivery method that gives you a receiptThe postmark date, or the date you hand it to the delivery service10 business days after the notice arrives
Rhode IslandMail, telegram, or other written noticeMail: the postmark date, provided the developer or escrow agent actually receives it. Other writing: on delivery20 days after you demand it, or 5 days after your funds clear, whichever is later
South CarolinaThe required contract notice says certified mail with return receipt, or another verifiable methodMail: the postmark date, provided the seller actually receives it. Other methods: on delivery to the seller’s address20 days after the notice, if you received no benefits under the contract
TennesseeHand delivery, prepaid U.S. mail, or emailMail: postmarked inside the period. Email: time-stamped inside the period30 days after the notice arrives
TexasHand delivery, prepaid U.S. mail, or overnight carrierNot statedBy day 30 after the notice arrives, or day 5 after your funds clear, whichever is later
UtahHand delivery, certified mail with return receipt, or a courier that proves deliveryDelivered or postmarked by midnight of the fifth business day30 days after the developer receives it
VermontHand delivery to the seller, or certified mail to the developer or its agent for service of processA mailed notice has to be dated on or before day five15 days after the notice arrives
VirginiaHand delivery to the developer’s principal office or the project, or certified mail with return receiptCertified mail: the postmark date45 days after the notice arrives
WashingtonMail or hand deliveryNot statedNot stated beyond a refund of what you paid
West VirginiaWritten notice to the seller at the address in the contractThe required contract notice says on the date sentNot stated in this section
WisconsinPersonal delivery, or mail to the developer or its agent for service of processMail: the postmark date20 days after the notice, or 5 days after your check clears, whichever is later

Three patterns stand out. A few states (Colorado, Iowa, North Carolina and Tennessee) accept electronic notice, and two (California and Connecticut) accept fax, but most expect paper. Where the statute protects a mailed notice on the day it goes out, the protection often comes with a condition, such as certified mail in Delaware, Oregon, Vermont and Virginia, or actual receipt in Florida, Maryland, North Carolina, Rhode Island and South Carolina. And in the states marked “Not stated,” nothing in the statute rescues a letter still in transit when the deadline passes.

Whatever your state, read your contract’s cancellation clause for the method and the address, and use certified mail with a return receipt unless the clause requires something else. The rescission period guide has a sample letter and a checklist for proving when you sent it.

The 11 states without a statute we could verify

We looked at each of these individually. Either no timeshare cancellation statute turned up, or the law other publishers point to has been repealed, says something different, or covers another type of property.

StateOur findingNext step for a buyer there
KansasWe located no Kansas timeshare act; article 32 of chapter 58 governs land and water recreational areas. K.S.A. 50-640, the door-to-door rule, excludes real property sales, which leaves a deeded week outside it.Your contract’s terms, then a lawyer licensed in Kansas.
KentuckyKRS chapter 367 contains no timeshare cancellation period that we could find. KRS 367.397 gives three business days to cancel a buying club or vacation club membership; we could not confirm that it reaches a timeshare.A Kentucky lawyer reading the clause in your paperwork.
MichiganMichigan repealed its Land Sales Act (MCL 565.801 through 565.835). A broader home solicitation rule exists in MCL 445.931; whether it covers real estate is something we could not confirm.Disregard pages that still cite the old act; a Michigan lawyer can say which rule controls.
MississippiNothing timeshare-specific located.Your paperwork, then a Mississippi lawyer.
MontanaSection 37-53-304 used to allow seven days. Senate Bill 455 of 2023 (Laws ch. 482, sec. 17) repealed it as part of ending state timeshare registration on October 1, 2023, and no substitute turned up.Disregard pages that still cite 37-53-304; check the contract and ask a Montana lawyer.
New HampshireChapter 356-B is the state’s condominium law. It refers to timeshare interests without giving them a cancellation window that we could find.A New Hampshire lawyer can say whether the condominium chapter applies to you.
New YorkNo statute located. The Attorney General’s offering plan rules at 13 NYCRR 24.3 require a plan filed in New York to let buyers cancel by mailing notice postmarked within seven business days of signing, and the Attorney General says that right applies if a New York plan has been filed.Ask the seller whether a New York offering plan was filed, read the cancellation page of the plan, send early, and have a New York lawyer confirm.
North DakotaChapter 47-24 of the Century Code turns out to be a repealed gifts-to-minors law.Your paperwork, then a North Dakota lawyer.
OhioSection 5311.27 allows 15 days, but only for condominium interests sold in breach of disclosure rules, which makes it something narrower than a cooling-off period for timeshares.An Ohio lawyer can tell you if 5311.27 fits your sale.
South DakotaChapter 43-15A covers condominiums.Your paperwork, then a South Dakota lawyer.
WyomingChapter 25 of title 34 deals with the state plane coordinate system. A home solicitation rule appears at W.S. 40-14-252, and its reach to real estate is unconfirmed.Check the contract, then ask a Wyoming lawyer whether any cancellation right applies.

My state is blank. Do I have any right to cancel?

Possibly, through the contract rather than the statute. Developers that sell in many states often print one cancellation period into every contract, which can hand you a right your own legislature never created. Connecticut’s statute, for instance, expressly lets a developer offer more than five days where the state in which the timeshare sits requires it, and Arizona’s requires the contract disclosure to show the longer period if the developer allows one. Turn to the first pages of your purchase agreement and look for the words “cancel” or “rescind.”

Do not count on the federal three-day rule. Under the FTC’s Cooling-Off Rule, buyers get three days to back out of some sales made away from the seller’s permanent place of business, a hotel room or convention center included, which describes many timeshare pitches. The FTC’s own guidance then excludes sales involving real estate, and a deeded week counts as real estate. Your state statute and your contract set the deadline.

How do I count the days for my state?

Write the dates down before you count. Here is how the rules play out for one signing date, a Saturday:

  • Calendar days (Florida, ten days): Sunday is day one, and day ten is the following Tuesday. Your right runs until midnight that night, unless you received the last required document later, in which case count from that date.
  • Business days, signing day excluded (Utah, five days): Saturday and Sunday do not count, so day one is Monday and day five is Friday. The notice has to be delivered or postmarked by midnight Friday.
  • Sunday excluded only if it is day five (South Carolina and Alabama): Sunday is day one and Thursday is day five, so the Sunday rule never comes into play for a Saturday signing.

Holidays can move a business-day deadline, and the start date can move every deadline in the states that count from receipt of documents. The deadline calculator does the arithmetic, but your contract and the statute control.

Check the start date before you give up

Line up the “countdown begins” column with what you were actually handed, and when. If the developer never handed over the offering statement and the other mandatory disclosures, your window may never have opened in many of these states. Arkansas lets the buyer void the contract until that statement arrives. Washington makes the agreement voidable until the disclosure document arrives and for seven days after.

Florida and Maryland go further. Under Fla. Stat. 721.10, a buyer may undo a closing that took place inside the cancellation period for up to five years afterward, and a closing after a waiver of the cancellation right, knowing or not, is voidable for one year after the period would have expired. Maryland’s statute makes an early closing, or an attempt to get a buyer to waive the right, unlawful and lets the buyer void that closing for one year after the cancellation period ends. Both turn on dates in your own file, so have an attorney licensed in that state read it.

The right is also hard to sign away. Florida and Delaware call any attempt to obtain a waiver unlawful; Connecticut, Nevada and Texas make a contract with a waiver voidable by the buyer; California’s required notice says an attempted waiver is void; and Minnesota says no act of the buyer can waive it. If a salesperson asks you to initial a waiver, decline, and write down that they asked.

What should I do once my deadline has really passed?

Once the window is closed, these are the next steps, in this order.

Ask the resort, and check the resale market. Send the developer or management company a letter naming its exit, surrender or deed-back program, and ask for the price and the conditions on paper. At the same time, look up recent resale prices for weeks like yours. For owners who want out, the FTC says to “start by contacting your timeshare company directly.” Developers generally have no legal duty to take a timeshare back, which leaves eligibility and price up to them. Wyndham is a good example: its Certified Exit page offers voluntary surrender only under the heading for paid-off loans, asks owners to make it their “first and only call,” and says that working with outsiders may leave options “limited or nonexistent,” so finish that process and get Wyndham’s answer on paper before you contact an outside firm. Holiday Inn Club and Westgate owners should also hold off on any exit firm, free consultation included, until the developer has answered in writing.

Disclosure: Candid Timeshare works with Vacation Ownership Consultants, a timeshare exit firm, and may be paid when readers hire it.

Vacation Ownership Consultants begins its own process at the same place. The first step on its How It Works page reads: “Contact your resort and check the resale market.”

Say no to the upgrade. The developer’s answer often arrives as a sales offer. ARDA, the trade group for developers, paid Ernst & Young for its 2026 industry study, which found that people who already owned accounted for 61% of 2025 sales volume. In 2025 annual reports, Hilton Grand Vacations put existing owners at 74% of contract sales and Marriott Vacations Worldwide at about 70% of its sales, and Travel + Leisure Co. (the Club Wyndham seller) reported that upgrades made up 72% of its net vacation ownership interest sales. Don’t sign at the exit call or at any owner update meeting it leads to. An upgrade adds to what you own.

No resale value and a refusal, or a price you won’t pay? One route to consider is an exit firm’s free consultation and file review. With VOC, you upload your billing statements, purchase agreement and deed (if you have one) through its eligibility form, its team works out which options fit your ownership, a free file review follows, and you choose afterward whether to sign up at its one-time flat fee. VOC’s home page says its consultations are “supported by seasoned industry partners and experienced timeshare attorneys.” Whichever firm you talk to, it should review your documents before quoting, quote one flat fee in writing, name the attorney on your file so you can look them up with the state bar, put in writing what happens to the fee if the developer refuses, never tell you to stop paying, never guarantee a result or claim ties to your developer, and say so when a free route is still available. Beyond that, a lawyer of your own can press a documented claim, and a licensed resale broker who takes nothing upfront can list the week. Our route-by-route guide covers each one.

If you were misled, a separate deadline applies. A misrepresentation claim can outlast the cancellation window. Arizona, for one, gives a buyer two years from the violation to sue over fraud or a material misstatement in the sale, with an outer limit of three years from the sale itself. Make notes of the salesperson’s claims today, then read which sales promises can become claims.

Stay current meanwhile. The developer loan is a separate debt that often carries a steep rate, and lenders rarely refinance against the timeshare because its resale value is close to nothing. If you qualify for a lower rate, a personal loan can replace the developer loan; see paying off a timeshare loan.

How this table was checked

Each of the 39 rows rests on a reading of the statute named in it, and in October 2026 we re-read every one of them for both tables. Where a state’s own site blocked automated reading, we read the section on a site that reproduces it (Justia, FindLaw or Onecle) or an Internet Archive copy of the official page. Idaho is in the table because its land sales chapter defines subdivided lands to include time shared property and gives five days to rescind; Oklahoma’s row comes from a land sales code of the same kind.

None of the rows was taken from an exit firm, a resale company or a law firm, VOC included. If you find a mistake, or a statute we overlooked for a blank state, send it and we will read it and correct the table.

Disclosure: Candid Timeshare works with Vacation Ownership Consultants, a timeshare exit firm, and may be paid when readers hire it. This page’s author, Kira Fairbank, is a manager at Vacation Ownership Consultants. We cite its published case data on this page where marked.

This page is general information, not legal advice. Your deadline depends on which state’s law your agreement picks, the dates your documents reached you, and contract wording no table can see. When the window is nearly shut, mail the notice first and then phone a lawyer licensed in the governing state.

Sources

Checked October 2026. Read our editorial policy or report an error.

  1. Florida Legislature: section 721.10 (purchaser cancellation)
  2. Arizona Legislature: section 32-2197.03 (rescinding a timeshare purchase)
  3. Arizona Legislature: section 32-2197.19 (deadline to sue over a timeshare sale)
  4. California Business and Professions Code section 11238, as reproduced by California.Public.Law
  5. California Business and Professions Code section 11239 (cancellation notice form), California.Public.Law
  6. Colorado Revised Statutes section 6-1-703, as reproduced by Colorado.Public.Law
  7. Connecticut General Assembly: chapter 734b, sections 42-103pp and 42-103qq
  8. Delaware Code Online: title 6, section 2824
  9. Illinois Real Estate Timeshare Act section 10-10, as reproduced by Onecle
  10. Iowa Legislature: Code section 557A.14 (PDF)
  11. Maine Legislature: title 33, section 592
  12. Maryland General Assembly: Real Property section 11A-114
  13. Minnesota Revisor of Statutes: section 83.28
  14. Nevada Revised Statutes 119A.410, as reproduced by Nevada.Public.Law
  15. New Jersey statute 45:15-16.67 on Justia, read through the Internet Archive
  16. New Mexico statute 47-11-5 on FindLaw, read through the Internet Archive
  17. Oregon Revised Statutes 94.836, as reproduced by OregonLaws
  18. South Carolina Legislature: Code title 27, chapter 32
  19. Texas Property Code 221.041, as reproduced by Texas.Public.Law
  20. Texas Property Code 221.042 (how to send notice, refunds), Texas.Public.Law
  21. Utah Code 57-19-12 on Justia, read through the Internet Archive
  22. Washington State Legislature: RCW 64.36.150
  23. Alaska Legislature: AS 34.08.580 (print view)
  24. Tennessee Code 66-32-114 on FindLaw
  25. Wisconsin Legislature: statute 707.47
  26. Vermont Legislature: 27 V.S.A. section 607 (time-shares; right to cancel)
  27. Code of Virginia: section 55.1-2221 (purchaser's rights of cancellation)
  28. Massachusetts General Laws chapter 183B, section 41, as reproduced by Onecle
  29. Missouri Revisor of Statutes: section 407.620
  30. Nebraska Legislature: statute 76-1716 (mutual right of cancellation)
  31. North Carolina General Assembly: G.S. 93A-45 (PDF)
  32. West Virginia Legislature: Code section 36-9-5
  33. Idaho Legislature: title 55, chapter 18, including sections 55-1801 (definitions) and 55-1804A (right of rescission) (PDF)
  34. Hawaii Legislature: HRS 514E-8 (mutual right to cancel)
  35. Louisiana Legislature: R.S. 9:1131.13 (cancellation)
  36. Rhode Island General Assembly: section 34-41-4.06 (purchaser's right to cancel)
  37. Tennessee Code 66-32-114 on Justia
  38. Pennsylvania statute 63 P.S. 455.609 on FindLaw
  39. Georgia Code 44-3-174 on FindLaw
  40. New York 13 NYCRR 24.3 (timeshare offering plan contents), via Cornell Legal Information Institute
  41. New York Attorney General: timeshares
  42. FTC consumer guidance on the Cooling-Off Rule and buyer's remorse
  43. FTC consumer guidance on timeshares, vacation clubs and related scams
  44. Wyndham Cares: Certified Exit program page
  45. ARDA (developers' trade group), 2026 State of the Vacation Timeshare Industry, full report by Ernst & Young
  46. SEC filing: Travel + Leisure Co. annual report (10-K), fiscal 2025
  47. SEC filing: Marriott Vacations Worldwide annual report (10-K), fiscal 2025
  48. SEC filing: Hilton Grand Vacations annual report (10-K), fiscal 2025
  49. Vacation Ownership Consultants: How It Works page
  50. Vacation Ownership Consultants: home page

Frequently asked questions

How many days do I have to cancel a timeshare?

The state whose law governs your contract sets the number. Indiana allows 72 hours, Massachusetts and Nebraska allow three business days, and most states fall between five and ten days. Alaska allows 15 days when the buyer did not get the public offering statement at least 15 days before signing, and Tennessee allows 15 days to a buyer who never inspected the property in person.

If I mail my cancellation on the last day, does it still count?

In many states, yes. Delaware, Minnesota, Oregon, Arkansas and Hawaii treat a mailed notice as given when it is mailed, Missouri, Pennsylvania, Virginia and Wisconsin go by the postmark, and Illinois and New Jersey count it if it reaches the Postal Service by midnight of the last day. Florida, Maryland, North Carolina, Rhode Island and South Carolina use the postmark as long as the developer actually receives the letter. Nevada, Texas and several other states list delivery methods without saying when the notice takes effect, so in those states aim for the letter to arrive before the deadline.

Can I cancel a timeshare by email?

Only where the statute or your contract allows it. Colorado's statute accepts electronic notice and treats an email as given when sent, Tennessee's accepts an email time-stamped inside the cancellation period, North Carolina's counts electronic notice when it is transmitted as long as the developer receives it, and Iowa's lets a buyer cancel electronically. Connecticut and California allow fax. Everywhere else, use the method your contract names and keep proof of mailing and delivery.

Do weekends count toward the timeshare cancellation deadline?

Usually, unless the statute says business days. Seven states count business days: Delaware, Iowa, Massachusetts, Nebraska, Rhode Island, Wisconsin and Utah, which also leaves the signing day out. Delaware's timeshare law defines a business day as any day except a Sunday or legal holiday, so Saturdays count there. Alabama and South Carolina skip a Sunday that falls on the fifth day, Georgia leaves out Sundays and holidays, and in Virginia a final day that is a Sunday or legal holiday rolls forward one day.

Why do some states have no timeshare cancellation period listed?

For eleven states we found no timeshare cancellation statute we could stand behind, so we left the deadline blank rather than guess. In several of them the law other websites cite was repealed or covers something else, such as condominiums. If your state is one of the eleven, read the cancellation clause in your own contract, because many developers write a cancellation period into contracts in every state where they sell.

What can I do after the cancellation deadline has passed?

Make sure it has, since many states start counting only once the disclosure documents reach you. If the window is gone, write to the developer about its surrender or deed-back program, check what similar weeks resell for, and count an upgrade offer as a refusal. Where the week has no resale value and the developer turns you down or names a price you cannot accept, a free file review from an exit firm is one option, alongside your own attorney or a licensed resale broker.

Keep reading

All guides
Ready to get out?

Start your timeshare exit with a free review.

If the resort won't take it back, an exit specialist will look at your contract and tell you whether you qualify. The consultation costs nothing, and you decide what happens next.